CLIENT: INFRARED
SERVICES: Owner’s Engineering
YEAR: 2024
COUNTRY: España
The new photovoltaic plant is located in the municipality of Valencina de la Concepción, in the province of Seville, and will have an installed capacity of 2×50 MWp. The point of interconnection (POI) is located at the existing REE substation, called Salteras 220 kV. The construction of this infrastructure has been structured through an EPC contract. In this case, Ingenor has managed the EPC and O&M bidding, as well as overseeing the Construction Management and the comprehensive supervision of the work.