Archive

CLIENT: EMGIASA SERVICES: Complete Project & Site Supervision YEAR: 2013 COUNTRY: Spain EMGIASA promoted by public tender, the selection of various architectural teams to develop subsidized housing with bioclimatic criteria in 40 terrains in the South Extension of Alcorcón. In this Project, INGENOR has supported the Client with the full Design of the Project...

CLIENT: ISOLUX SERVICES: Complete Project YEAR: 2013 COUNTRY: Spain Development of the architecture and engineering for a new Hydrogen Technology Experiment and Fuel Cells Center (CNH 2), located in Puertollano, Ciudad Real. The Center is dedicated to scientific and technological research in all aspects of hydrogen technologies and fuel cells. The complex is developed...

CLIENT: Acciona Industrial SERVICES: Detailed Engineering YEAR: 2018 COUNTRY: México The project includes the development of two wind farms called PER I-IV and PER V, two new substations (34.5/400 kV) and the required transmission lines in 400 kV. The new Wind Farm will have a total of 123 wind turbines of 3.6MW each, with...

CLIENT: Acciona Industrial SERVICES: Detail Engineering YEAR: 2018 COUNTRY: México The project involves the construction of two wind farms called East and West, two new substations and the required transmission lines in 400 kV. The new park will have a total of 86 wind turbines of 3.6MW each, with a total output of 310MW...

CLIENT: ENVISION – Vive Energía SERVICES: Owner´s Engineering YEAR: 2017 COUNTRY: México The new wind farm located in the Yucatan Peninsula will have 36 turbines ENVISION EN110-2.5MW with an installed capacity of 90MW. INGENOR has provided the Owner´s Engineering Services including the basic engineering and the management of the tender process for the EPC...

CLIENT: Contour Global SERVICES: Conceptual Engineering and Interconnection Studies YEAR: 2017 COUNTRY: México The new wind farm located in the city of Mexicali, will have 74 GE 2.3 MW wind turbines with an installed capacity of 170MW. INGENOR has carried out the conceptual engineering of the project as well as studies for the interconnection...

CLIENT: Renovalia SERVICES: Foundations Due Dilligence YEAR: 2012 COUNTRY: México The new Piedra Larga wind farm consists of 45 turbines with a total installed capacity of 90MW. INGENOR has done a technical due diligence of the design of the WTG Foundations in order to resolve some site execution problems....

CLIENT: Fondo Capital Infraestructura SERVICES: Technical Due Dilligence YEAR: 2016 COUNTRY: México INGENOR has carried out a complete technical Due Dilligence of the existing wind farm. The project consists of 30 V112-3.3MW IEC IIA turbines with a total installed capacity of 100MW....

CLIENT: Various SERVICES: Engineering services YEAR: 2004-Present COUNTRY: Spain Since 2014, INGENOR has been involved in several wind projects around Spain for different costumers such as BERINCO, SOCOIN, EUFER, RENOVALIA, ENEL, etc....

CLIENT: Interacciones SERVICES: Technical Due Dilligence YEAR: 2014 COUNTRY: México Ojuelos photovoltaic plant is located in the State of Jalisco and has a installed peak power of 30 MWp. As part of that project, INGENOR carried out Technical Due Diligence (TDD) project in order to study the feasibility of the project for the corresponding...