CLIENT: Acciona Industrial
SERVICES: Detail Engineering
YEAR: 2018
COUNTRY: México
The project involves the construction of two wind farms called East and West, two new substations and the required transmission lines in 400 kV.
The new park will have a total of 86 wind turbines of 3.6MW each, with a total output of 310MW installed together.
The scope of INGENOR corresponds to the detailed engineering of the Energy Plant.