MESA LA PAZ 310MW WIND FARM

CLIENT: Acciona Industrial

SERVICES: Detail Engineering

YEAR: 2018

COUNTRY: México

The project involves the construction of two wind farms called East and West, two new substations and the required transmission lines in 400 kV.

The new park will have a total of 86 wind turbines of 3.6MW each, with a total output of 310MW installed together.

The scope of INGENOR corresponds to the detailed engineering of the Energy Plant.