CLIENT: Santander Green Investment SERVICES: Owner's Engineering YEAR: 2024 COUNTRY: Italia The new photovoltaic plant is located in the municipality of San Pietro, in the Calabria region (Italy), and has an installed capacity of 81.5 MWp. The facility is equipped with bifacial panels, string inverters, and tracking systems with trackers. The construction...

CLIENT: Santander Green Investment SERVICES: Owner's Engineering YEAR: 2024 COUNTRY España The new photovoltaic plant is located in Jerez de la Frontera, in the province of Cádiz, and has an installed capacity of 50 MWp. The facility is equipped with bifacial panels, string inverters, and tracking systems with trackers. The construction of...

CLIENT: BENBROS SERVICES: Administrative Project YEAR: 2024 COUNTRY: España The Energy Storage Plant named "BESS Valle de Güimar" is located in the municipality of Arafo, in the province of Santa Cruz de Tenerife, on the island of Tenerife (Canary Islands). The infrastructure has an installed capacity of 12 MVA, an energy storage...

CLIENT: BENBROS SERVICES: Administrative Project YEAR: 2024 COUNTRY: España The Energy Storage Plant named "BESS Marina de Cudeyo" is located in the municipality of Astillero, within the territory of Cantabria. The infrastructure has an installed capacity of 12.00 MW and an energy storage capacity of 41 MWh. Ingenor has been responsible for...

CLIENT: BENBROS SERVICES: Administrative Project YEAR: 2024 COUNTRY: España The Energy Storage Plant named "BESS Mieres" is located in the municipality of Lena, within the territory of Asturias. The infrastructure has an installed capacity of 12.00 MW and an energy storage capacity of 46 MWh. Ingenor has been responsible for the complete...

CLIENT: BENBROS SERVICES: Administrative Project YEAR: 2024 COUNTRY: España The Energy Storage Plant named "BESS Lajara" is located in the municipality of Güeñes, within the historical territory of Bizkaia. The infrastructure has an installed capacity of 24.00 MW, an authorized access capacity at the Connection Point of 20 MW, and an energy...

CLIENT: BENBROS SERVICES: Administrative Project YEAR: 2024 COUNTRY: España The Energy Storage Plant named "BESS Lezama" is located in the municipality of Lezama, within the historical territory of Bizkaia. The infrastructure has an installed capacity of 20.00 MW, an authorized access capacity at the Connection Point of 15 MW, and an energy...

CLIENT: BENBROS SERVICES: Administrative Project YEAR: 2024 COUNTRY: España The Energy Storage Plant named "BESS Retuerto" is located in the municipality of Barakaldo, within the historical territory of Bizkaia. The infrastructure has an installed capacity of 24.00 MW, an authorized access capacity at the Connection Point of 20 MW, and an energy...

CLIENT: Acciona Industrial SERVICES: Detailed Engineering YEAR: 2018 COUNTRY: México The project includes the development of two wind farms called PER I-IV and PER V, two new substations (34.5/400 kV) and the required transmission lines in 400 kV. The new Wind Farm will have a total of 123 wind turbines of 3.6MW each, with...

CLIENT: Acciona Industrial SERVICES: Detail Engineering YEAR: 2018 COUNTRY: México The project involves the construction of two wind farms called East and West, two new substations and the required transmission lines in 400 kV. The new park will have a total of 86 wind turbines of 3.6MW each, with a total output of 310MW...