CLIENT: Santander Green Investment
SERVICES: Owner’s Engineering
YEAR: 2024
COUNTRY: Italia
The new photovoltaic plant is located in the municipality of San Pietro, in the Calabria region (Italy), and has an installed capacity of 81.5 MWp. The facility is equipped with bifacial panels, string inverters, and tracking systems with trackers. The construction of the infrastructure has been structured through an EPC contract. In this case, Ingenor has managed the EPC and O&M bidding, in addition to handling the Construction Management and the comprehensive supervision of the work.