CLIENT: BENBROS
SERVICES: Administrative Project
YEAR: 2024
COUNTRY: España
The Energy Storage Plant named “BESS Lezama” is located in the municipality of Lezama, within the historical territory of Bizkaia.
The infrastructure has an installed capacity of 20.00 MW, an authorized access capacity at the Connection Point of 15 MW, and an energy storage capacity of 60 MWh.
Ingenor has been responsible for the complete design of the plant in order to obtain the various administrative authorizations, including the evacuation infrastructure.