CLIENT: HELLÍN ENERGÉTICA
SERVICES: Detail engineering
YEAR: 2014
COUNTRY: Spain
Within an 18,000m2 terrain, a new industrial warehouse of 5,000m2 will be built.
The production plant will be divided into 2 sectors. One dedicated to testing with a 7MW production line and the other, a commercial line with a capacity of 20MW.