CLIENT: NEMESIS
SERVICES: MEP Engineering
YEAR: 2017
COUNTRY: México
The project consists of two towers “Torre Marea 1” and “Torre Marea 2” and an amenities building and residential Signature Phase 1, 2 and 3.
Both Towers are formed by 21 levels with a 10 typology of apartments in each unit.
The scope of Ingenor corresponds to the MEP Engineering Design.