CLIENT: SUNPOWER
SERVICES: Transmission Line Basic Design
YEAR: 2017
COUNTRY: México
SUNPOWER is developing two photovoltaic plants, Danu I and II in Hidalgo State. The Danu I project involves a three-phase transmission line 230kV with a11.7 km length. Danu II includes a three-phase transmission line 230kV with a 2.6 km length.
INGENOR has carried out the study of the layout of the lines and their PLSCAD modeling and subsequent authorizations management.