CLIENT: Contour Global
SERVICES: Conceptual Engineering and Interconnection Studies
YEAR: 2017
COUNTRY: México
The new wind farm located in the city of Mexicali, will have 74 GE 2.3 MW wind turbines with an installed capacity of 170MW.
INGENOR has carried out the conceptual engineering of the project as well as studies for the interconnection required by CENACE.